1-hour TSP Monitoring Results                
                       
Station CM_CB1a, The Arcade, Cyberport                
  Start Finish Weather  TSP Concentration  Action Level Limit Level Site Conditions / Temperature Wind Speed Sampler Filter
Date Time Time   (µg/m3) (µg/m3) (µg/m3) Observations / Remarks (°C) (m/s) ID ID
01-Nov-13 09:14 10:14 Fine 116 279.9 500 Operation of concrete pump 24.1 <5 LD-3B-002 N/A
01-Nov-13 10:14 11:14 Fine 144 279.9 500 Operation of concrete pump 24.1 <5 LD-3B-002 N/A
01-Nov-13 11:14 12:14 Fine 170 279.9 500 Operation of concrete pump 24.1 <5 LD-3B-002 N/A
07-Nov-13 13:00 14:00 Fine 256 279.9 500 Operation of concrete pump 24.1 <5 LD-3B-002 N/A
07-Nov-13 14:00 15:00 Fine 259 279.9 500 Operation of concrete pump 24.1 <5 LD-3B-002 N/A
07-Nov-13 15:00 16:00 Fine 245 279.9 500 Operation of concrete pump 24.1 <5 LD-3B-002 N/A
13-Nov-13 09:21 10:21 Cloudy 156 279.9 500 Operation of concrete pump 20.7 <5 LD-3B-002 N/A
13-Nov-13 10:21 11:21 Cloudy 153 279.9 500 Operation of concrete pump 20.7 <5 LD-3B-002 N/A
13-Nov-13 11:21 12:21 Cloudy 149 279.9 500 Operation of concrete pump 20.7 <5 LD-3B-002 N/A
19-Nov-13 08:53 09:53 Fine 164 279.9 500 Operation of concrete pump 20.2 <5 LD-3B-002 N/A
19-Nov-13 09:53 10:53 Fine 163 279.9 500 Operation of concrete pump 20.2 <5 LD-3B-002 N/A
19-Nov-13 10:53 11:53 Fine 162 279.9 500 Operation of concrete pump 20.2 <5 LD-3B-002 N/A
25-Nov-13 13:15 14:15 Fine 74 279.9 500 Tunnel works 19.5 <5 LD-3B-002 N/A
25-Nov-13 14:15 15:15 Fine 76 279.9 500 Tunnel works 19.5 <5 LD-3B-002 N/A
25-Nov-13 15:15 16:15 Fine 80 279.9 500 Tunnel works 19.5 <5 LD-3B-002 N/A
29-Nov-13 09:08 10:08 Fine 97 279.9 500 Tunnel works 15.0 <5 LD-3B-002 N/A
29-Nov-13 10:08 11:08 Fine 102 279.9 500 Tunnel works 15.0 <5 LD-3B-002 N/A
29-Nov-13 11:08 12:08 Fine 100 279.9 500 Tunnel works 15.0 <5 LD-3B-002 N/A
Min. 74
Max. 259
Average 148